#1735163: Heads Up - Capacity with Confidence: The Chip-to-Grid Blueprint for AI Data Center Design
| Description: |
AI-driven data centers are evolving into utility-scale electrical infrastructures. As hyperscale facilities approach gigawatt demand, traditional siloed design approaches are no longer sufficient. To design with confidence in 2026 and beyond, engineering firms must adopt a holistic Chip-to-Grid perspective, integrating transmission planning, substation design, medium- and low-voltage distribution, and silicon-level workloads into one unified electrical model. In this session, John Francis presents a new approach to designing and analyzing AI Factory infrastructure. Learn how ETAP’s collaboration with NVIDIA enables high-fidelity digital twins and accelerated computing to simulate electrical, thermal, and mechanical interactions, allowing teams to validate performance, resiliency, and interconnection readiness earlier in the project lifecycle. This webinar is tailored for electrical consultants, EPCs, data center designers, grid interconnection engineers, and infrastructure planners working on next-generation AI facilities. |
|---|---|
| More info: | https://events.se.com/event/862be024-459f-45cb-89f7-0f08d9f49502/regProcessStep1?utm_source=sfmc&utm_medium=email&utm_campaign=invitation2&utm_id=invitation2&campaign_objective=consideration&mcl_name=df&subkey=548dd7e42fa15a5bb4046582cbb6f562997463f14599d9244012e07f97793ff7 |
| Date added | April 29, 2026, 12:59 p.m. |
|---|---|
| Source | Events |
| Subjects | |
| Venue | April 30, 2026, midnight - April 30, 2026, midnight |
